West Europe - Area 1

The Netherlands, Germany Rhine/Main, Italy

Connections

 

Karlsruhe

Domodossola

Ludwigshafen KTL

Busto Arsizio-Gallarate

Ludwigshafen KTL

Novara CIM

Rotterdam Botlek

Busto Arsizio-Gallarate

Rotterdam RSC

Busto Arsizio-Gallarate

Rotterdam RSC                    

Brescia

Rotterdam RSC                    

Ludwigshafen KTL

Rotterdam RSC                    

Mannheim Contargo

Rotterdam RSC

Melzo

Rotterdam RSC                    

Novara CIM

Rotterdam RSC                    

Verona Q. Europa

Venlo

Busto A.-Gallarate

Team
Works on the Rhine Valley line: all news about the replacement programme

 

From 8.4.22 to 24.4.22, extensive construction work take place on the Rhine Valley railway between Mannheim and Basel. During this period, the track capacity is greatly reduced due to various partial and full closures.

 

The replacement program


Together with DB Netze and our rail partners, we have drawn up a replacement program for around 70% of the regular trains. Just under half of these approximately 650 trains are scheduled via the Rhine Valley. All possible replacement capacities are used. The remaining volume is routed via the Gäubahn, Brenner and France. For 70% of the trains, we can offer the P400 profile.

 

Over the Easter holidays, the Rhine Valley line will be closed from 14.4.22, 23.00, until 18.4.22. Practically NO trains can run via the Rhine Valley. The already limited capacity will be further reduced to almost zero. The diversionary routes via Gäubahn, France and Brenner can accommodate just under 50% of the traffic.

 

Further measures


Extra trains are running between Busto and Basel to support transalpine traffic.

 

A task force is on duty 24/7 to coordinate possible events with the railways. Every opportunity to use any capacity that may become available is seized.

 

Preparations for week 16, when the train program will be ramped up again, are in full swing.


The implementation


14.4.2022 - As expected, not all trains of the closely timed diversionary service can circulate due to various traffic incidents. About 15% of the replacement program is cancelled due to operational disturbances.

Get a quote

Contact

Mattia
Zanotta
Area Manager |
Shuttle Net West Europe
Hupac Intermodal SA
Viale R. Manzoni 6
CH-6830 Chiasso
+41 58 8558110
mzanotta@hupac.com

Single point of contact

line1@hupac.com